
USPS Package Size Limits: Where 108 Inches Changes the Price
USPS package size limits turn on girth, not weight: 108 inches for Priority Mail, 130 for Ground Advantage, plus three size fees that stack before it.
Tips and guides for adding size annotations to your product images

USPS package size limits turn on girth, not weight: 108 inches for Priority Mail, 130 for Ground Advantage, plus three size fees that stack before it.

Air freight maximum dimensions are set by the ULD, not the aircraft: 163 cm in the belly, 244 cm on a freighter. The real ULD numbers, and what they cost you.

How to set MOQ without guessing: build the number up from the case pack, the pallet and the container, and always say which unit it is counted in.

360 product photography requirements decoded: Amazon’s real frame counts, who is allowed to upload a spin, and the one buyer question a spin cannot answer.

Bol.com product image requirements start at 500 × 500 px — but a content score decides whose photo appears. Full specs, rejection traps and 2026 changes.

A2-70 vs A4-80 packs two facts into one code: the steel grade and the property class. What ISO 3506-1:2020 requires, and what the head must show.

Sink base cabinet size is not the sink size: a 33-inch sink needs a 36-inch base. The cabinet, cutout and apron numbers to lock before you quote.

Foam density vs ILD are two different specs: density is kg/m3 durability, ILD is pounds of firmness. The four-line foam spec that stops cushion disputes.

Packing list vs commercial invoice: the two documents share five numbers, and customs, the carrier and the buyer each reject the shipment over a different one.

Comfort height vanity or standard height? 32, 34 and 36 inches each serve a different buyer, and only one of them clears the ADA lavatory maximum.

Size in the product title now competes for 75 characters on Amazon. What to keep, what moves to item highlights, and where the dimensions belong.

Hotel FF&E specification requirements, document by document: the nine files a hospitality buyer needs before your factory gets on the bid list.